RETURNS

In accordance with the provisions of the Consolidated Text of the General Law for the Defense of Consumers and Users and other complementary laws (Royal Legislative Decree 1/2007, of November 16) (hereinafter "LGCYU"), the client will have the right to the withdrawal of the requested order within a period of 15 calendar days from its receipt, after notifying Plusenergy Solar SL, CLICK HERE using this withdrawal document for this purpose.

 

The withdrawal document must be sent to our email angela@wccsolar.es with the subject "Return Request" and with a video of the complete installation. Plusenergy Solar SL is obliged, by virtue of the aforementioned Law, to return the amount of the product. Due to the nature of the products supplied by Plusenergy Solar SL, the company is not responsible for the postage derived from shipping the products in the withdrawal period or free withdrawal period, or for any type of return for which Plusenergy Solar SL recommends proper advice prior to purchase. By virtue of covering the technical information needs on any of the products, the Technical Department remains at your disposal at 854 556 349 or at alex@wccsolar.es to advise you free of charge and without obligation with the aim that the product finally purchased meets your expectations, needs, compatibility and expected use.

For any possible incident or claim, we recommend that you contact Customer Service, by phone: 854 556 349

The costs of the shipment (postage) will be borne by the client if the client wants a collection to be managed, cost of collection by Plusenergy Solar SL will be €21.78 + VAT as long as the weight of the product is less than 25Kg. For those products with a higher weight, contact Plusenergy Solar SL

Monetary refunds made by POS are made effective in the customer's account in up to 10 business days.

Returns should be sent to the following address:

Headquarters

Plusenergy Solar SL

Polygon El Pino
Calle Pino Estrobo 11-13 
41016 Seville

The refund of the amount will be made by payment.

In the case of requesting a return, except in cases in which the seller offers to collect the goods, the consumer must return them to the seller or to a person authorized by him within 15 calendar days from the day after he communicates his decision to the seller. to give up

The amount paid will be refunded. Notwithstanding the foregoing, the consumer and user will be responsible for the decrease in value of the goods resulting from handling them other than that necessary to establish their nature, characteristics or operation, and it is therefore essential that the product be find in perfect condition. If the item is not returned in the same original packaging, it will suffer depreciation. Likewise, the client will be responsible for the decrease in the value of the product that may result from misuse, handling or non-professional installation, or malfunction such as short circuit in the event of factors external to the normal use of the product, such as surges or drops in voltage. , use of inappropriate accessories or those prohibited by the manufacturers, falls, water, fire or incorrect or abusive handling by the customer or by third parties not authorized by the manufacturers.

Return costs will be borne by the seller. If, on the contrary, you wish to replace the product, Plusenergy Solar SL undertakes to deliver to the customer another product in perfect condition once the condition of the returned product has been received and verified and the difference between these two has been settled.

In particular, within the framework of the products marketed by Plusenergy Solar SL, the right of withdrawal will not apply once the services have begun, as well as for stationary batteries made to order as they are a personalized product.

Plusenergy Solar SL will take the appropriate measures to ensure that the products have the aforementioned characteristics and that the state of the product has the necessary requirements for the refund of the amount paid by the customer.

In the specific case of batteries, Plusenergy Solar SL will prepare a report using the KGCFSH- (µC-XCF08) capacity calculation machine to verify that the use of the batteries has been correct and following the manufacturer's recommendations.

The refund of the amount will be made by the same method of payment in which the purchase was made, except for the purchase against reimbursement, in which case the amount will be refunded by bank transfer, as well as in the event that made the payment in cash.

Regarding the services provided, once started they cannot be returned under any circumstances.

The installations carried out by the team of installers that are part of the WccSolar staff enjoy a guarantee period of 6 months in accordance with current regulations. This guarantee will be applicable as long as there is no improper manipulation or incorrect maintenance of the installation carried out. WccSolar reserves the right to carry out the appropriate tests to establish the feasibility of applying the guarantee to the installations.

Warranty

 

According to the LGCYU legal framework that aims to provide the consumer with different options to demand sanitation when the good purchased is not in accordance with the contract, giving him the option of demanding the repair or replacement of the good, unless this is impossible or disproportionate.

The guarantee of consumer goods that do not have a correct operation is divided into two periods.

These periods are maintained as long as the manufacturer does not specify longer periods in which case the guarantee will be applied as established by the manufacturer in question, or for those products that by their nature enjoy a longer guarantee period, such as solar panels, that have a 10-year mechanical guarantee and a 25-year power delivery guarantee, for the rest of the products the situation is as follows:

The periods that are distinguished, provided that there is no different mention by the manufacturer, are:

- Period from its acquisition (in the case of having made the purchase in person) or possession (in the case of having made an online purchase) up to 6 months.

- Period from 6 months to 2 years of its acquisition (in the case of having made a face-to-face purchase) or possession (in the case of having made an online purchase).

The periods are specified in detail below.

Period from its acquisition or possession up to 6 months

In accordance with the provisions of the LGCYU, the guarantee on the articles will be applied provided that the article meets the following characteristics upon return:

- That the product is in the first six months from its acquisition (in the case of having purchased the item directly in our facilities), or from the possession of the product (in the case of having purchased the item online).

- That the product has undergone correct use, the manufacturer's recommendations have been followed and its handling has been correct.

- That with the return of the product the accessories are also returned and that it is delivered in the same state in which PlusEnegy Solar SL sent it, for example, in the case of batteries, they must be returned charged.

- That the product has its original packaging and documents.

- That the products do not have obvious signs of mishandling, damage or breakage.

In the event that the product has irregularities in its operation, a manufacturing defect can be appealed.

The right to apply the guarantee of Plusenergy Solar SL products is subject to the fact that the product has been used correctly, following the manufacturer's recommendations, for the use for which the product has been manufactured and with the elements compatible with it.

No more than two months should pass between the customer experiencing a problem with their product and the notification to Plusenergy Solar, otherwise the product loses its warranty.

Plusenergy Solar SL will not be responsible for possible damages that may result from misuse, handling or non-professional installation, or malfunctions such as short circuits. The guarantee will not be valid in case of factors external to the normal use of the product, such as power surges or drops, use of inappropriate accessories or those prohibited by manufacturers, falls, water, fire or incorrect or abusive handling by the customer or by third parties not authorized by the manufacturers.

In addition, the product must have had proper maintenance under what the manufacturer determines.

Plusenergy Solar SL will take the appropriate measures to ensure that the products have the aforementioned characteristics and that the state of the product meets the necessary requirements for the application of the guarantee.

In the specific case of batteries, Plusenergy Solar SL will make a report using the capacity calculation machine KGCFSH- (µC-XCF08)   to verify that the batteries have been used correctly. and following the manufacturer's recommendations.

Finally, if you wish to send the product to exercise your warranty right, you must send it to the address provided below with the accessories purchased along with the product (if any), as well as in the same conditions as the product was purchased, for example In the case of batteries, they must be delivered charged.

Period from 6 months to 2 years from its acquisition or possession

Those products that present irregularities in their operation during this period of time can exercise the guarantee right provided that together with the defective product an industrial expert report is sent that affirms that the product during its useful life was used correctly and that any problem in its operation is the consequence of a manufacturing defect carried over time.

No more than two months should pass between the customer experiencing a problem with their product and the notification to Plusenergy Solar, otherwise the product loses its warranty.

Plusenergy Solar SL will not be responsible for possible damages that may result from misuse, handling or non-professional installation, or malfunctions such as short circuits. The guarantee will not be valid in case of factors external to the normal use of the product, such as power surges or drops, use of inappropriate accessories or those prohibited by manufacturers, falls, water, fire or incorrect or abusive handling by the customer or by third parties not authorized by the manufacturers.

In the case of products that are sent to Plusenergy Solar SL without the aforementioned industrial expert report, Plusenergy Solar SL is waiting to receive the industrial expert report to proceed with the assessment of the application of the guarantee. The industrial expertise will always be borne by the client, independently of the resulting report.

Once the client provides Plusenergy Solar SL with the defective product and the industrial expert report, the company will proceed to check the data provided by the industrial expert report, for example, in the case of batteries, at this point Plusenergy Solar SL compares the information in the report provided by the client with the report issued by the capacity calculation machine KGCFSH- (µC-XCF08) after connecting the battery to this device.

Only those batteries will be replaced or repaired whose report of the industrial survey provided by the client and the report of the capacity calculation machine KGCFSH- (µC-XCF08) conclude that the battery has been used for the purposes described by the manufacturer and its use and maintenance has been correct throughout its useful life, so the operating problems experienced by the battery are the result of a manufacturing defect.

In the event that the reports provided go in the same direction and the conclusion is that the operating problem derives from a manufacturing defect, Plusenergy Solar SL undertakes with the customer to repair or replace the battery in question.

In any other case, the guarantee will not apply.

Investor Guarantee

 

When we install a piece of equipment, it is important not to forget to ground the inverter. This land shall be an exclusive land. If there is no earth, the inverter should not be connected to the house's earth, as any derivation in the installation will affect the most sensitive equipment in the circuit, in this case the inverter. This requirement is essential for the application of the guarantee.

In addition to the use and management of the inverter being in accordance with what the manufacturer specifies, it is essential that there is parity between the inverter and the rest of the elements of the photovoltaic installation, you can consult HERE the compatibility that must exist between the elements of the installation .

On the other hand, Plusenergy Solar SL, is not responsible for the effects on the photovoltaic system, profitability, efficiency, breakage or problems in operation as a result of the poor conditions of the electrical panel of the house.

The study, installation, fine-tuning of the system, guarantee of the products and all the rights to which consumers are entitled will be limited to the extent that the electrical panel of their home does not comply with the 'Electrotechnical Regulation for low voltage and complementary technical instructions' (REBT-ITC), which establishes the framework of technical conditions and guarantees that electrical installations connected to a supply source within the limits of low voltage must meet in terms of safety, operation and reliability for installations and people. For this reason, Plusenergy Solar is not responsible for the effectiveness of the photovoltaic solar installation and is not responsible for possible failures that may occur from the solar inverter to the consumption of the home, leaving any problem that occurs under the sole responsibility of the client.

In the inverters there are three errors (error 9, 51 and 53) and exploded Mosfet that directly affect the power stage of the inverter. These types of errors, in most cases, are caused by derivations in the home or short circuits in the electrical network that supply the inverter, which is why, in order to process this type of incident, we need to have the differentials and circuit breaker/s that protect the home against network anomalies.

Hence, the guarantee against errors 9, 51, 53 or Mosfet exploited is applicable provided that the client has previously sent to:angela@wccsolar.esorder number, photographs or video of the differentials and circuit breaker(s) connected to the inverter in a pertinent way to guarantee a safe installation. In the event that the described photographs or video have not been previously sent, Plusenergy Solar will not be able to apply the guarantee, since it is assumed that they do not exist in the system and therefore that the client has not taken the security measures correct established by the manufacturer to proceed with the application of its guarantee or withdrawal.

In short, the inverter warranty is applicable as long as the inverter has a manufacturing defect, and when there is correct handling, use and compatibility with the rest of the elements of the installation, as well as that the safety measures have been taken. correct.

For the correct management of the guarantee or withdrawal of the inverter in the event that it presents error 9, 51, 53 or exploded Mosfet, Plusenergy Solar must have received photographs or videos with the connections of the inverter to the corresponding differentials and magneto-thermal/s, complying with security measures.

To speed up the solution of the problems derived from error 9, 51 or 53, Plusenergy Solar recommends that the client send the photographs or videos of the connection of the inverter with the differentials and magneto-thermal/s immediately after its installation.

Guarantee of Structures for Solar Panels

 

Whenever there is a total or partial detachment of a structure for solar panels, if according to the State Association of Meteorology (AEMET) during this period of time there have been winds of more than 104 km/hour or 29 meters within a radius of 50 km /second Plusenergy Solar SL will not be responsible for its detachment.

In fact, when there are gusts of wind of more than 104 km/hour or 29 meters/second, manufacturers do not guarantee that their structures on roofs, facades or floors will not detach.

ADDRESS TO SHIP PRODUCTS TO EXERCISE WARRANTY RIGHTS

 

The address to which the products on which you wish to exercise your right of return, replacement or repair must be sent is to the central offices:

Plusenergy Solar SL
Polygon El Pino

Calle Pino Estrobo 11-13 

41016 Seville

OBJECTIVE TEST TO DETERMINE THE CORRECT USE OF BATTERIES FOR THE SPECIFIC CASE

 

Therefore, for the described guarantee that covers all Plusenergy Solar SL products to be applicable, there must be objective evidence to confirm that the product has really been used correctly, and that the malfunction of the product derives from a manufacturing defect. .

Batteries, as they are a product that is especially sensitive to use, have a special treatment to proceed to their price refund, repair or replacement, depending on the moment in time in which the life of the battery is found.

Plusenergy Solar SL has the capacity calculation machine  (µC-XCF08) which, through its connection to the battery, charges and discharges the battery, studying its behavior and issuing a report that communicates based on the data obtained if a battery has been connected in parallel, if it has been used as a starting battery, if, if required, the battery has been filled with distilled water, if during its useful life it has experienced deep discharges, since when the battery presents the specific problem, etc, and thus be able to compare the report issued by the capacity calculation machine (µC-XCF08) with the manufacturer's technical sheet, to conclude if the use and maintenance of the battery has been correct .

The return, repair or replacement of the battery will only be possible if the report concludes that the battery has been used correctly and the problem with its operation is derived from a manufacturing fault.

POSTAGE ASSUMED FOR SHIPPING THE PRODUCT WITH THE REQUEST FOR THE APPLICATION OF THE WARRANTY

The postage for the return will be paid by the customer, once the product is reviewed by Plusenergy Solar SL and it is confirmed that it is a warranty problem, if it is a problem as a result of manufacturing and does not exceed 3 calendar months from the reception of the same, the shipping costs will be paid by the factory as well as the repair costs, in case of misuse, bad installation or similar, the costs will be covered by the client.

BATTERY MAINTENANCE

 

It is an essential requirement for the application of the battery guarantee that they have received proper maintenance throughout their useful life, so apart from the recommendations that the manufacturer may specify in each case, Plusenergy Solar SL establishes Below are some minimum operating rules that the customer must comply with in order to assume the correct use of the batteries and thus the guarantee is applicable following the established protocol and always complying with the current recommendations with those established by the manufacturer.

The warranty time of each type of battery must be taken into account.

o    Monoblock (acid/lead) : 1 Year Warranty
or    AGM: 1 Year Warranty
o    OPZS: 2 Years Warranty
o    TOPZS: 2 Years Warranty
or    SOPZS: 2 Years Warranty
or    GEL: 1 Year Warranty
o    Lithium: 10 Years Warranty
or    CPZS: 2 Years Warranty

- Open Lead Acid Batteries

  • Control of its internal levels of distilled water and fill so that it is between the minimum and the maximum indicated on the container. The distilled water should loosely cover the internal plates.

  • Install in a place with ventilation.

  • Do not overturn, stand with the terminals upwards during transport, handling, installation and operation.

  • Connect in parallel must put the equalizer

  • Install indoors protected from direct sunlight.

  • Avoid exposing the batteries to more than 25ºC.

  • Avoid proximity to fire or flammable substances.

  • After a month and a half of life, check the firmness of the terminals.

  • Avoid periodic deep discharges.

- AGM batteries

  • Do not overturn, stand with the terminals upwards during transport, handling, installation and operation.

  • Connect in parallel should put the equalizer.

  • Install indoors protected from direct sunlight.

  • Avoid exposing the batteries to more than 25ºC.

  • Avoid proximity to fire or flammable substances.

  • After a month and a half of life, check the firmness of the terminals.

  • Avoid periodic deep discharges.

- GEL batteries

  • Do not overturn, stand with the terminals upwards during transport, handling, installation and operation.

  • Connect in parallel should put the equalizer.

  • Install indoors protected from direct sunlight.

  • Avoid exposing the batteries to more than 25ºC.

  • Avoid proximity to fire or flammable substances.

  • After a month and a half of life, check the firmness of the terminals.

  • Avoid periodic deep discharges.

- OPzS Stationary Batteries

  • Control of its internal levels of sulfuric acid and fill if necessary with distilled water so that its internal levels are between the minimum and maximum indicated on the container. Distilled water loosely cover the internal plates.

  • Install in a place with ventilation.

  • Do not overturn, stand with the terminals upwards during transport, handling, installation and operation.

  • Connect in parallel should put the equalizer.

  • Install indoors protected from direct sunlight.

  • Avoid exposing the batteries to more than 25ºC.

  • Avoid proximity to fire or flammable substances.

  • After a month and a half of life, check the firmness of the terminals.

  • Avoid periodic deep discharges.

- OPzV Stationary Batteries

  • Do not overturn, stand with the terminals upwards during transport, handling, installation and operation.

  • Connect in parallel must put the equalizer

  • Install indoors protected from direct sunlight.

  • Avoid exposing the batteries to more than 25ºC.

  • Avoid proximity to fire or flammable substances.

  • After a month and a half of life, check the firmness of the terminals.

  • Avoid periodic deep discharges.

- TOPzS Stationary Batteries

  • Control of its internal levels of sulfuric acid and fill if necessary with distilled water so that its internal levels are between the minimum and maximum indicated on the container. Distilled water loosely cover the internal plates.

  • Install in a place with ventilation.

  • Do not overturn, stand with the terminals upwards during transport, handling, installation and operation.

  • Connect in parallel must put the equalizer

  • Install indoors protected from direct sunlight.

  • Avoid exposing the batteries to more than 25ºC.

  • Avoid proximity to fire or flammable substances.

  • After a month and a half of life, check the firmness of the terminals.

  • Avoid periodic deep discharges.

- Lithium Batteries

  • Do not overturn, stand with the terminals upwards during transport, handling, installation and operation.

  • Install indoors protected from direct sunlight.

  • Avoid exposing and charging batteries outside the temperature range set by the manufacturer.

  • Avoid proximity to fire or flammable substances.

  • After a month and a half of life, check the firmness of the terminals.

 

CLAIMS FOR DEFECTIVE OR WRONG MERCHANDISE

 

The delivery note or invoice issued by Plusenergy Solar SL is valid as a manufacturer's guarantee, it will take effect from the day the delivery is made to the buyer's address.

Claims for possible incidents such as the product being delivered damaged, wrong, or for any other cause that may be claimed, must be notified within 24 hours of receiving the merchandise. 854556349 or by sending an email to angela@wccsolar.es  and send a photo of the incident.

After this period, the customer accepts the merchandise offered and loses his right to claim.

DELIVERY AND UNLOADING OF THE MERCHANDISE

 

The conditions of delivery of the merchandise are subject to the facilities and limitations of access and nature of the download, as well as the dimensions and weight of the material estimated by the logistics company.

The possibility of setting a collection point with easy access is available to the customer.

The customer, upon receiving the merchandise, must immediately check that the material received and its condition are correct. To review the material received, the client has 24 hours to carry out the verification and subsequent notification to Plusenergy Solar SL in the event that the material received has irregularities. After a period of 24 hours from the moment of receipt of the merchandise, Plusenergy Solar SL is not responsible for the state or quality of the material received.

In those cases in which the place of delivery of the merchandise is difficult to access and this implies an extra cost for the logistics company, Plusenergy Solar SL will contact the client to transfer part of this extra cost, contact us for more information.

PURCHASE CONDITIONS

 

These terms of service represent the general conditions of sale for all Plusenergy Solar SL product orders and will form part of the sales contract.

The acceptance of the products will imply the acceptance of these conditions of sale, prices and payments.

The prices that appear in the store already include 21% VAT

If you have registered from a VAT exempt area, only the net price of the item will appear.

Plusenergy Solar SL reserves the right to change the price of items without prior notice in accordance with market conditions.

The preparation time is from 1 to 3 business days, the delivery time for parcels is 24/48 hours for heavy parcels is 3 to 5 business days, approximate time according to the transport company, this may vary depending on transport problems or incidents .

PAYMENT METHODS

 

- Credit card

- PayPal

- Bank Transfer 
(Santander Bank) ES16 0049 5937 6126 1615 4098

- Cash on delivery

Payment must be made by the means indicated at the time of the order and in euros (€). We accept as a means of payment the deposit into an account or bank transfer, payment by credit card through PayPal or by cash on delivery (+5% expenses for transport).

Certain articles only accept the prior transfer as a form of payment. The accepted limit for cash on delivery orders is €1,000, for orders of a higher amount a prior transfer is required.

For large purchase volumes, consult price and availability.

When the payment method is cash on delivery, the delivery of material may take 48 to 72 hours, until telephone confirmation of the cash on delivery order.

If the client chooses cash on delivery as payment method, there is no stock of the material and Plusenergy Solar SL offers the client an alternative so as not to delay the delivery of the material, in the event that Plusenergy Solar SL does not receive a reply, the company will take the deadline 3 weeks to cancel the order in the event of not receiving a response from the customer.

 

DELIVERY TIMES AND AVAILABILITY OF PRODUCTS

 

With the exception of a possible particular agreement, the products of the tariff  Plusenergy Solar SL will be served within a period of between 2-5 business days for orders within the Iberian Peninsula in parcel delivery.

For orders to the Canary or Balearic Islands, it will be between 7 to 10 business days.

The commitment acquired by Plusenergy Solar SL for the sale and delivery of the merchandise offered is subject to the stock of the advertised product and its availability while supplies last, for which reason Plusenergy Solar SL, in its commitment to quality and customer service, tries at all times that the advertised products are available, announcing in each product the delivery time according to our stock. However, in the event of a stock shortage of the product included in the order, the customer/user will be informed of the new expected delivery period and the customer/user may choose to accept it, or to cancel the order.

The delivery is considered made from the moment the product is made available to the Customer by the carrier and the recipient signs the receipt of the delivery. It is up to the recipient to verify the products upon receipt and expose all the reservations and claims that may be justified.

Deliveries will be made at the customer's expense, provided that the circumstances that imply free shipping do not occur.

OWNERSHIP AND RISK

All products will remain the property of Plusenergy Solar SL until full payment of the amount thereof is satisfied.

PLUSENERGY SOLAR SL AUTHORIZED INSTALLATION COMPANY

 

Plusenergy Solar SL is an authorized installation company registered in the RII with registration number 10-B-D09-46092152, classified within section D (Installer), authorization 0 (Low Voltage), category 9 (Specialist Category / Power Generating Installations). Low Voltage) since March 25, 2019. You can consult the Integrated Industrial Registry here.

ISOLATED CONNECTION INSTALLATION

 

Plusenergy Solar SL offers you the installation service of a wide variety of photovoltaic kits, among which the isolated connection kits stand out.

If the client contracts the installation service of a grid connection kit, they must take into account the following points that define the obligations and responsibility of Plusenergy Solar SL and the client:

- The photovoltaic installation ends in the protection box at the inverter output, that is, the connection to the electrical network is not made.

Plusenergy Solar SL installers only connect the inverter to the home's general protection panel if the customer has previously made the wiring between both points; In the event that the client has not previously carried out this task, the Plusenergy Solar installers will leave a protection prepared so that the client can carry out the wiring and connection from the inverter output to the protection panel afterwards.

In other words, the connection will only be made between the power line of the home and the inverter, or between the generator and the inverter if the client prepares the necessary wiring so that the only work to be done by the installers is the connection .

Under no circumstances is the cable used for these cases the one that includes the photovoltaic kit unless Plusenergy Solar SL is informed of the need to include more wiring to connect additional elements, in which case it will be quoted and must be paid following the same process than the rest of the elements of the installation.

- The location of the inverter and the batteries must have been chosen by the customer before the installers carry out the photovoltaic installation.

The place that the client has decided for the installation of the inverter must be close to a wall and at a maximum distance of 1 meter from the battery bank, since the inverter will be fixed to the wall. In addition, this location must be accessible, ventilated and have a temperature that is as stable as possible and close to 25ºC.

- The power line from the solar panels to the inverter is made with a gray corrugated tube on the surface to the façade.

In the event that the client wishes that the tube is not visible for aesthetic reasons, the task of embedding the tube must have been carried out by the client before the installers travel to carry out the installation. In this way, the installers will carry out the wiring through the tube previously embedded by the customer (ask the installers for the diameter of the tube).

- Unpaid material must be settled at the time the installers enter your home.

The estimate must be paid in full before installation.

NETWORK CONNECTION INSTALLATION

Plusenergy Solar SL offers you the installation service of a wide variety of photovoltaic kits, among which the grid connection kits stand out.

If the client contracts the installation service of a grid connection kit, they must take into account the following points that define the obligations and responsibility of Plusenergy Solar SL and the client:

- The location of the inverter must have been chosen by the client before the installers carry out the photovoltaic installation and must be located 2 meters maximum from the main panel of the house.

In order to adhere to the prices by zone, in the event that the client wants the inverter to be located more than 2 meters from the general picture of the house, it must be the client who prepares the recessed of corrugated pipe and the wiring between the inverter location and the housing panel, in this case, consult the installers for the section of the cables.

The inverter will be fixed to the wall and the location must be accessible, ventilated and have a temperature that is as stable as possible and close to 25ºC.

- The power line from the solar panels to the inverter is made with a gray corrugated tube on the surface to the façade.

In the event that the client wishes that the tube is not visible for aesthetic reasons, the task of embedding the tube must have been carried out by the client before the installers travel to carry out the installation. In this way, the installers will carry out the wiring through the tube previously embedded by the customer (ask the installers for the diameter of the tube).

- Unpaid material must be settled at the time the installers enter your home.

Under no circumstances is the material unloaded or any work carried out without 100% of the amount of the material having been paid.

It is recommended to have the exact amount prepared to avoid delays.

- The cost of labor must be paid when the photovoltaic installation has been completed and started and its operation is correct, and always before the installers leave the home.

CLAIMS SHEET

 

Plusenergy Solar SL makes the claim forms available to customers at the company's registered office. The parties submit, at their option, for the resolution of conflicts and waiving any other jurisdiction, to the courts and tribunals of the user's domicile.

In compliance with current regulations, Plusenergy Solar SL offers you easy access to la Online Dispute Resolution (ODR) Platform.

In WccSolar we are Multibrand Distributors of Solar Energy Supplies.

 

WccSolar is First Distributor of several brands of Solar Inverters, We also have an associated technical service to respond quickly to any problem or incident that could be caused by your Inverter devices.

 

This technical service will be active both during the warranty period and outside this period. In which this service will be offered to the client so that any problem can be solved. Offering peace of mind to the customer in the purchase of our devices.

TECHNICAL-SERVICE--en.jpg
Secure payment
ssl-secure-connection-2.jpg

Customer Service and Telephone Sales

854 556 349

Technical service

954 089 500

Send us your Queries

servicio@wccsolar.es

install wccsolar solar kit
free solar energy

Schedule

Monday to Friday

From 10:00 to 19:00

shipping to europe wccsolar

Shipments to Spain in 24h
In Europe

3-6 day

All our products for Renewable Energies comply with the most demanding regulations.

All our products for Renewable Energies comply with the most demanding regulations.

5PORCIENTO-1570548999.jpg
bottom of page